SMA Sunny Boy 2.5 Smart Connected Inverter
The SMA Sunny Boy 2.5 Smart Connected inverter is an excellent choice for small solar power systems on homes. Thanks to its compact size (460x357x122mm) and light weight (9.2kg), installation of this inverter is easy and quick. With a standby consumption of only 2 watts, it is also energy-efficient.
You can connect up to 5000 watts peak to this inverter and it works optimally between 260 and 500 volts. The maximum output power is 2500 watts, ideal for domestic use. The SMA Sunny Boy 2.5 single-phase inverter features the innovative Smart Connected service. This feature provides automatic monitoring and analysis of the inverter, enabling irregularities to be quickly detected and faults to be quickly rectified. The prerequisite is that the plant is registered with Sunny Portal and SMA Smart Connected.
Advantages of the SMA Sunny Boy 2.5 Smart Connected
- Small and light: Easy to install thanks to its compact size and light weight.
- High efficiency: Standby consumption of only 2 watts and optimal operation between 260 and 500 volts.
- Smart Connected Service: Automatic monitoring and troubleshooting for minimum downtime.
- User-friendly interface: Integrated web interface for easy monitoring via computer or mobile device.
- Wireless communication: Easily connects to your home network for optimal performance.
About SMA Solar
SMA Solar is a leading German manufacturer of solar panel inverters. The company is known for the high quality of its products and excellent customer service, available in Dutch. With everything you need to monitor and develop a smart home, SMA Solar offers a complete solution for your solar power system.
SMA offers a 5-year warranty on their products as standard, testament to their confidence in the durability and reliability of their inverters.
Shadow problems? Use Tigo Optimizers
Do you have shadows on your solar panels? Then use the <a href=”https://www.stralendgroen.nl/product/tigo-energy-ts4-a-optimizer/”><strong>Tigo optimisers</strong></a> for optimal energy yield.
Step-by-step plan for commissioning the SMA Sunny Boy 2.5 Smart Connected
- Preparation:
- Check the installation: Ensure that all solar modules are correctly installed and the Solar cables are fitted with the Sunclix connectors provided in the correct polarity.
- Read the manual: Review the installation manual and safety instructions to avoid mistakes and work safely.
- Mechanical Installation:
- Mount the inverter: Mount the inverter on a solid and suitable surface or wall, following the instructions in the manual.
- Provide ventilation: Ensure that the inverter has sufficient space for ventilation to prevent overheating.
- Electrical Connections:
- DC-side connections: Connect the solar panels to the DC inputs of the inverter. Make sure the polarity is correct.
- AC-side connections: Connect the inverter to the electricity grid via the AC output. For the Sunny Boy 2.5 1-phase inverter, use 3-wire YMVK cable.
- Ground connection: Ensure that the inverter is properly grounded to prevent electric shock. Also ensure that the mounting system is earthed with a suitable grounding wire.
- Network connections:
- Communication: Connect the inverter to the home network via an Ethernet cable or use the internal Wi-Fi antenna.
- Sunny Portal: Register the inverter with the Sunny Portal for remote monitoring and configuration.
- Configuration:
- Start the inverter: Switch on the inverter by turning on the main switch.
- Download the SMA360 app: and register in Sunny Portal
- Initiate setup: Follow the instructions in the SMA app to configure the inverter.
- Language and country settings: Set the appropriate country and language settings.
- Communication for monitoring: Connect the inverter to your router for remote monitoring
- Smart Connected activation: Activate the Smart Connected service for automatic monitoring and maintenance.
- Testing:
- Verify operation: Ensure that the inverter is working correctly by checking the output and status messages.
- Monitoring: Verify that the inverter is displayed correctly in the Sunny Portal and that all data is transmitted correctly.
- Completion:
- Security check: Perform a final security check to ensure that all connections are robust and secure.
- Documentation: Complete all required documentation and registration forms.